Mali Bamako Solar/BESS/EV Charger Off-grid System
2026-11-03 21:27:50
Project Name: Bamako 1.72MWh Integrated Solar/B-ESS/EV Charger System
Customer Background: Provide basic power supply guarantee for the whole office building, meet the system's on-grid and off-grid operation from Monday to Friday, reduce power consumption on weekends, and fully charge the energy storage power for next week's use
Pain point: The customer's photovoltaic installation capacity is less than 200kW, and the generated electricity cannot meet the building's total electricity consumption. Meanwhile, there are three 60kW DC charging piles needed to charge more than 20 new energy vehicles.
Solution: To meet customers 'electricity demand, we will expand the energy storage capacity ratio, with total installed capacity 800kW/1.72MWh. During photovoltaic operation, prioritize power supply to loads while storing surplus electricity. When mains power is available, the system will recharge through mains. This ensures sufficient storage capacity to meet the building's total electricity needs. During outages, the energy storage system releases power, with diesel generators providing backup power.

EMS System Diagram