Mali Factory PV/B-ESS/Generator On/Off-grid System Project
2026-11-03 21:27:50
Project Name: Bamako 1MWh System
Customer Background: An African factory with three injection molding machines (average power 120-150kW). The customer has a self-used factory on the third floor and needs to solve the daily production electricity consumption.
Pain point requirements: Due to the excessive power of a single device, the optical storage system must be able to guarantee that the whole system can complete sufficient load when off-grid, and the production can not be affected by power failure, and the system can operate at full load
Solution: Implement a modular parallel system with AC coupling. Given the client's sufficient photovoltaic installation area, prioritize solar power for production, store surplus electricity, and supplement with diesel generators. Adopt a 3+2 off-grid parallel energy storage system to ensure stable operation of equipment in each factory building, guaranteeing over 12 hours of continuous production capacity.